Project Description

June – September 2014
A range of “turnkey” to “desalination stations’ under the following headings:

  • power supply
  • technology
  • lighting
  • electric heating
  • ventilation and air conditioning
  • computerization
  • security alarm
  • CCTV
  • Delivery of all necessary equipment for each section, including metal structures, cables, control cabinets and power supply, local boxes, fans, etc.
  • Installation of cable constructions (system PUK WERKE) in the premises pumping station number 1-2, the main building, rooms number 1-5 wells and indoor air filters number 1-2
  • Digging cable trenches with a total length – 2 km
  • Laying and connection of cables (power, control and information), both inside buildings and outside.
  • Installation of cabinets, boxes and all local equipment on all sections, including laboratory equipment.
  • Connection and commissioning
  • Commissioning

 

January – June 2014
Electrical work on the terminal shipment of cement to automobiles and w / d cars

  • Installation of necessary electrical equipment (Siemens, Schenk, Metler Toledo), including barriers and traffic lights entry / exit terminals
  • Installation of cable trays and laying cables
  • Connection, commissioning and putting into operation

Project Details

Client:ТОВ « КаспійЦемент»